Other Info
Schedule-
3/5-3/6:
Filming will begin, and should get done in one day, however one extra day is allotted for any miscalculations.
3/8:
Any non-diegetic sounds will be recorded. This will also be the day I review the film I have collected.
3/10-3/11:
Editing will begin. I will use iMovie to edit my film, as it is easy to piece together various scenes and sound design.
3/12-3/13:
Editing will be done by the 12th and any extra final touches or scenes that need to be re-shot will be done on the 13th.
Location-
In addition to my house (shown below), there are two other filming locations. Scenes 1, 5, 6, 7, 8 ,9, and 10 will be filmed here.

For the last location, an office building will be used for the establishing shot in scene 3.
Participants-
Actors: Jacob Pineiro, Eva Lopez, Andrew Geis.
Filming: Eva Lopez
Editing: Jacob Pineiro
Directing: Jacob Pineiro
Health and Safety-
I have ensured that dangers of this production process have been minimized, not only by scripting safe scenes, but by also making sure any participants will get full consent as to what they are doing. The stairs scene may have some risks, as someone can fall. For this contingency, I have made sure that a first aid kit will be brought to the production site.
Backup Plan-
The original scheduling for the for this production process is designed with much room for error in mind. Just in case the weather does not prove satisfactory, there are multiple days to film. In case we are not allowed to film in certain areas, each scene has a "backup scene" where the scene can be filmed elsewhere. For example, if the hospital does not allowing filming on the staircase, a similar building with a staircase is another option that is nearby. If an actor or camera crew member gets injured or sick, they have people to fill in for them as well.
Comments
Post a Comment